Subscribe to R. STAHL's free newsletter now!

Keep abreast of all the latest developments in explosion protection. Our regular newsletters provide you with interesting facts from the field of Ex protection, R. STAHL's latest news, as well as information about our exciting products and solutions. 

More information

  • Get regular access to articles on important topics in the field of explosion protection.
  • Find out valuable information about our innovative products and solutions.
  • Look forward to tailored offers.
  • Find out our latest seminar dates for your diary.
  • Meet us at exhibitions and events.

Previous

Expert Mail - Newsletter bestellen En

Expert-Mail - Newsletter bestellen
More information (optional)
Weitere Angaben (optional)
personalien
Bestellung

PEC-FS for functional safety management

Processes that have a high hazard potential are often monitored by protective devices that are subject to functional safety. PEC-FS – module for functional safety management – supports you in inspecting the Safety Integrated Function (SIF) according to IEC 61508 and IEC 61511.

PEC-FS will help you prepare a SIL verification for all safety functions. Besides the SIL calculation the module includes the prior use consideration according to NE130, the link to the sensor and actuator list and the application of a test concept. Using our integrated inspection plan generator you will always keep track, even when there is a large number of different inspection plans happening in parallel.

Furthermore PEC-FS defines and executes electric and mechanical inspections and issues standardised inspection protocols for all your tasks. In other words, it helps you document all phases of functional safety from the design stage to the storage of previous protocols – easily and with no clutter.

Overview: PEC-FS

Your essential advantages of PEC-FS:

1. Inspect Safety Integrated Function (SIF), generate Safety Requirement Specifications (SRS) and calculate your Safety Integrity Level (SIL).

2. Flexible inspection concept.

3. Standardised inspection template.

4. Malfunction data acquisition.

5. Improved data quality due to a central management of data.

6. Mobile data availability.

7. Expert advice, on-site support and seminars.

8. Save money, considering the expenses for planning, executing and documenting the inspections can be reduced.

In addition to PEC-FS the PEC modules for explosion protection and for safety and quality assurance help you to keep your industrial plant safe.

In addition to explosion protection, functional safety SIL is an important safety aspect in plants. Learn more about SIL on the following page.

Ask our experts

Previous

Contact form

*Mandatory fields
Previous

We'll be glad to call you back to support you.

Wir rufen Sie gerne für ein Beratungsgespräch zurück. EN
*Mandatory